Press Release: New report into proposed incinerator reveals shocking statistics on hazardous fumes

With a decision on the proposed Green Lane Incinerator looming this week, a new report reveals that levels of toxic pollutants in the area surrounding the planned site are already at or above legal limits set by the European Commission.

If the incinerator is given the go ahead, the addition of a further 1000 HGVs a week to local roads and emissions from the incinerator itself, will see those levels soar.
The pollutants -including PM10 -have been linked to asthma in children and increased risk of mortality in people with pre-existing heart or respiratory conditions. Local resident campaign group, ʻSay No to the Green Lane Incineratorʼ plan to use the results of this study to oppose the plans when the planning panel meet on Thursday 2nd June to make a decision on whether to allow the Incinerator to be built.

They will protest outside Swinton Civic Centre on Thursday morning ahead of the planning panel and several members of the group will speak at the meeting to voice their concerns. Opposition to the proposal has been overwhelming with more than 4000 petition signatures gathered and over 1000 letters of objection submitted to the council leaving them in no doubt about the strength of feeling within the local community.

During their 18 month fight to stop the incinerator, campaigners have raised concerns about the emission of dioxins which are linked to cancer and birth defects and say they are seriously worried about the safety of the plant. In addition to highlighting potential health risks, the group will also be objecting to the
increased traffic the plant will bring. There are already 750 HGV movements a day on Green Lane, if the plant goes ahead this number will rise to 1000 which equates to one every thirty seconds during a normal working day. Local roads are simply not equipped to deal with that level and type of traffic.

Other issues include the proximity of the proposed plant to local amenities and its effects on the local environment. If given the green light, the incinerator situated just 50m from a children’s park and 100m from a school -will process nearly a quarter of a million tonnes of waste per year, 80,000 tonnes of which will be incinerated in a “gasification chamber”.

Leave a Reply

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>